AG Investment Limited (AG) is the EPC Contractor for the Divune Hydropower Plant (DHPP) owned by PNG Power Limited (PPL) in PNG. The output for DHPP is 3MW by two units of 1.5MW turbine.
DHPP is designed to use steel penstock to transfer water to the powerhouse located at 2km away from the weir intake. In order to ensure steel penstock meet the operation and the contract requirements related to material specification, Chen Welding Integrity (CWI) Services was engaged by AG to provide penstock material procurement support.
The details of the case study viewed from the link as follows: Case Study 001: Hydropower Plant Penstock Material Procurement Support